Case Study: Boston Logan International Airport Hangars

Translucent Polycarbonate Walls- Logan Airport Hangar - Boston, MA

Logan International Airport Hangars, Logan International Airport, Boston, MA Architect: Fennick McCredit Architecture Owner: Massachusetts Port Authority Photography: William Horne System: LIGHTWALL 3440® POLYCARBONATE WALL The Massachusetts Port Authority needed to renovate two maintenance hangars at Boston’s Logan International Airport with materials that could withstand the intense winters and harsh environment of aviation. This meant delivering good thermal performance, optimal […]

Case Study: Desert Aviation

KINETICWALL Custom Facade - Desert Aviation

Desert Aviation Center Remodel, 2722 Perimeter Road, North Las Vegas, NV 89032 Owner: Desert Aviation Center; North Las Vegas, Nevada Developer: G.A. Haan Development, LLC Architect: Carpenter Sellers Del Gatto (CSD) Architects; Las Vegas General Contractor: AJB General Contractors; North Las Vegas, Nevada Wind-driven façade system – installing contractor: Hartlauer Signs; Las Vegas Wind-driven façade system – engineering and manufacturing: EXTECH/Exterior […]

Case Study: Norfolk Southern Locomotive Facility

Industrial Window Renovation - Norfolk Southern Railyard

Juniata Locomotive Shop,  200 N 4th Ave, Altoona, PA 16601 Owner: Norfolk Southern Railway Wall and window manufacturer and installer: EXTECH/Exterior Technologies, Inc. Photography: David Bryce Photography LOCOMOTIVE FACILITY IMPROVES APPEARANCE AND FUNCTIONALITY OF 10 BUILDINGS BY REPLACING AGING WINDOWS WITH EXTECH’S SYSTEMS One of the nation’s premiere transportation companies, Norfolk Southern Corporation and its Norfolk Southern Railway […]

Case Study: Lynbrook Station Long Island Railroad

Long Island Railroad Transit Canopy System

Long Island Rail Road (LIRR), Lynbrook Station, Lynbrook, New York 11563 Owner: Metropolitan Transportation Authority; New York General & Installing Contractor: Zion Contracting; New York Skylight and Canopy Manufacturer: EXTECH/Exterior Technologies, Inc. Before and during photos: Courtesy of Zion Contracting After photos: Courtesy of Metropolitan  Transportation Authority, New York LONG ISLAND RAIL ROAD UPDATES LYNBROOK STATION’S PLATFORMS WITH EXTECH’S SKYLIGHT […]

Case Study: Restoration of Crotona Park

Custom Glass Block Restoration - Crotona Park

Clock towers lantern reconstruction at Crotona Park; 1700 Fulton Ave., Bronx, NY 10457 Owner/Architect: City of New York Parks and Recreation; New York Glass Block Lantern Contractor: Sandhu Contracting, Inc; Astoria, NY Glass Block Lantern Designer/Engineer/Fabricatior: EXTECH/Exterior Technologies, Inc. Photography: Oleg March NY CROTONA PARK’S HISTORIC CLOCK TOWER LANTERNS REVITALIZED WITH EXTECH’S CUSTOM GLASS BLOCK ASSEMBLY New York City’s […]

Case Study: Beloit College Powerhouse

LIGHTWALL 3440 Translucent Wall System - Athletic Facility

Beloit College Powerhouse; 850 Pleasant St., Beloit, WI 53511 Owner: Beloit College, WI Architect: Studio Gang Associate architect, electrical engineer, plumbing engineer, fire protection engineer, structural engineer, LEED consultant, commissioning consultant: Angus-Young Associates Construction Manager: Corporate Contractors, Inc. (CCI) Translucent Wall System Manufacturer: EXTECH/Exterior Technologies, Inc. Photography: Tom Harris EXTECH’s LIGHTWALL system transforms old power plant into Beloit College’s new Powerhouse for […]

Case Study: Glorya Kaufman Performing Arts Center Translucent Wall System

LIGHTWALL 3440 Translucent Wall System - Performing Arts Center

Glorya Kaufman Performing Arts Center; 300 Motor Ave., Los Angeles, CA  90034 Owner: Vista Del Mar Child and Family Services; Los Angeles Architect: Aux Architecture; Los Angeles General Contractor: Shawmut Design and Construction; Los Angeles Installing Contractor: Cal Pac Sheet Metal, Inc.; Santa Ana, California Translucent Wall System Manufacturer: EXTECH/Exterior Technologies, Inc.; Pittsburgh Photography: Nic Lehoux Completed in May 2021, the […]

Case Study: Factory Window Retrofit with LIGHTWALL 3440

Industrial retrofit - LIGHTWALL 3440 wall system

Factory, LLC; 315 Columbia Street, Bethlehem, PA 18015 Owner: Columbia Associates LLC; Bethlehem, PA Developer, design-builder: J.G. Petrucci Company, Inc Architect: Cerminara Architect; Township, NJ General Contractor: Iron Hill Construction Management; Bethlehem, PA Glazing contractor: Hutt’s Glass Co. Inc.; Bechtelsville, PA Translucent Wall System & Canopy System Manufacturer: EXTECH/Exterior Technologies, Inc.; Pittsburgh Photography: Courtesy of Factory, LLC Century-old steel mill re-envisioned as food […]

Case Study: FID Kennedy Revitalization

Industrial retrofit - Polycarbonate wall system

25 FID Kennedy; 25 Fid Kennedy Ave, Boston, MA 02210 Owner: Boston Planning & Development Agency Architect:Bargmann Hendrie + Archetype Inc. General Contractor: Consigli Contracting Translucent Wall System Manufacturer: EXTECH/Exterior Technologies, Inc.; Pittsburgh Built in the 1940s for the US Navy – the 25 FID Kennedy building has been used for different purposes over the years. Despite its […]

Case Study: Mixed-Use Bronx Post Office

Interior translucent wall panels

Bronx Post Office; 558 Grand Concourse Bronx, NY 10451 Architect: Studio V Architecture; New York General Contractor: Hollister Construction; Parsippany, NJ Translucent Wall System Manufacturer: EXTECH/Exterior Technologies, Inc.; Pittsburgh The historic Bronx Post Office, which once was an aging pillar of the Grand Concourse block of the Bronx, received a massive renovation starting in 2019. According to a […]

QUOTE REQUEST

Complete this form to request a quote.

Contact Information
Project Details