Location: Upper Manhattan, NYC
Architect: New York City Transit Authority
System: TECHVENT 5300
This project was at a large maintenance facility for New York City Transit. We replaced the deteriorated commercial windows with EXTECH’s patented TECHVENT 5300, continuous Top-Hinged polycarbonate window system. The bottom halves in each bay were fixed and the top halves operated in 150 ft. long wings. Rack and pinion operating hardware made that possible. The building was so large that the new EXTECH windows, if placed side to side, would stretch over four miles.
Benefits and details of the TECHVENT 5300 include:
Complete this form to request a quote.