Flexi-Panel Translucent Ceiling Panels

Case Study: IU Translucent Accessible Ceiling Panels

Luddy Hall School of Informatics, Computing, and Engineering | 700 N Woodlawn Ave, Bloomington, IN 47408 Luddy Hall, an innovative building on the Indiana University Bloomington campus, was completed in late 2017 to provide a host of benefits for the campus. The building included classroom spaces, 31+ research labs, and office space for the Informatics...

Case Study: Fort Worth KINETICWALL – Willow & Rise Apartments

Willow & Rise Parking Garage | 218 West Broadway Ave. Fort Worth, TX 76104 Maverick Development Group was searching for a creative way to meet code requirements and add visual charm to their recently completed Willow & Rise Apartments parking structure. The main challenge was meeting the code requirement that public right-of-way parking structures to...

Case Study: Industrial Window Renovation – BNSF Argentine Yard

BNSF Argentine Yard | 2201 Argentine BLVD., Kansas City, KS 66106 BNSF’s Argentine Yard in Kansas City, a railyard with a history dating back to 1875, recently completed a significant renovation project, designed by architect TDKA and led by general contractor George Allen Construction. Covering 780 acres, the BNSF Railway Company’s Argentine Yard is one...

Case Study: Anderson Field House

Anderson Auto Group Field House | 3663 Bullhead Pkwy, Bullhead City, AZ 86442 Located along the Colorado River in Bullhead City, Arizona, the new Anderson Auto Group Fieldhouse encompasses 126,000 square feet with regulation football and soccer fields, classrooms and space for up to 8,000 people. When not in use by the Colorado River Union...

Energy Advancement and Innovation Center at Ohio State University

Case Study: Ohio State Energy Advancement & Innovation Center

Ohio State Energy Advancement & Innovation Center | 2281 Kenny Rd., Columbus, OH 43221 Owner: Ohio State University Architect: Smith-Miller+Hawkinson & Moody Nolan General Contractor: Whiting-Turner Kokosing JV Installer: The Blakely Corporation Translucent Wall System Manufacturer: EXTECH   Ohio State Energy Advancement & Innovation Center A stunning new structure commissioned by Ohio State University, the...

Jackie Robinson Museum

Case Study: Jackie Robinson Museum

The Jackie Robinson Museum | 75 Varick St, New York, NY 10013 Owner: Jackie Robinson Foundation Architect: Gensler General Contractor: Structure Tone Glazier: Empire Architectural Metal Translucent Wall System Manufacturer: EXTECH   Jackie Robinson Museum The legacy of Jackie Robinson, the first African American to play professional baseball in the MLB, lives on at the...

Emulated Terracotta Facade at Monument Drive Transit Center

Case Study: Value Engineered Faux Terracotta Façade

Monument Drive Commuter Parking Garage & Transit Center | 12113 Government Center Parkway, Fairfax, VA 22035 Owner: County of Fairfax, VA Architect: HGA General Contractor: Howard Shockey & Sons Tube Wall Manufacturer & Engineer: EXTECH/Exterior Technologies Inc. Installing Contractor: Modern Door & Equipment Sales Inc. Emulated Terracotta Finish: Linetec Value Engineered Faux Terracotta Façade | ...

KINETICWALL Dynamic Façade Manufactured by EXTECH and Artist Ned Kahn

Case Study: Hudson Yards Open-Air KINETICWALL

"The Set" at Hudson Yards | 451 10th Avenue New York, NY 10018 Architect: March & White Design (MAWD) & Handel Architects General Contractor: Related Construction LLC Kinetic Design Artist: Ned Kahn Installing Contractor - KINETICWALL: Crown Sign Systems Inc. Manufacturer – KINETICWALL System: EXTECH/Exterior Technologies Inc. Photography: Courtesy of Ned Kahn Experience the movement: watch KINETICWALL...Continue reading

Scroll to top